Incentives come with stronger controls激励政策伴随更严格的约束
The Semicon 2.0 framework combines substantial public support with lock-in conditions on project assets, operations and ownership. These rules link access to incentives with the completion of commercial production.Semicon 2.0 框架在提供大规模公共支持的同时,也对项目资产、运营和所有权设置锁定条件。这些规定将激励政策的适用与商业生产完成联系起来。
Semicon 2.0 incentive schemeSemicon 2.0 激励计划
1.27 trillion INR1.27万亿印度卢比
20262026年
20262026年1.27 trillion INR
approximately US$ billion约合十亿美元13.22 trillion INR
- The asset restrictions apply until commercial production of the entire approved project is declared.资产限制将持续到整个获批项目宣布进入商业生产为止。